BUSINESSCBC NEWS
South Bow targets 2027 decision on Keystone XL partial revival
Canada's South Bow will decide by mid-2027 whether to proceed with its proposed partial revival of the Keystone XL oil pipeline. The company announced it has secured the necessary shipper commitments to advance the project.
Related Signal
Adjacent reporting
- Ukraine says Druzhba pipeline running Russian oil to Europe can resume work
- UAE to complete second oil pipeline bypassing strait of Hormuz by 2027
- Putin to discuss long-delayed pipeline with Xi
- UAE Will Double Oil Export Capacity Bypassing Hormuz by 2027
- Ukraine Ready to Resume Oil Flows on Druzhba Pipeline, Mol says
- Bitcoin Could Still Drop to $57K Before Real Bottom, Says Michael Terpin