Skip to content
The Nexus
BUSINESSJun 28 · 13:45 UTCTHE HINDU NATIONAL

KSEB pinning hopes on Kakkayam pumped storage project

KSEB is pinning hopes on the Kakkayam pumped storage project, which has an installed capacity between 800 MW and 1,000 MW. The organization has entrusted Tata Consulting Engineers with conducting geo-technical studies and preparing the project blueprint and detailed project report.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting