Skip to content
The Nexus
WORLDJul 6 · 07:08 UTCTHE HINDU NATIONAL

Flashfloods block Doda-Kishtwar highway, bury vehicles at under construction Kwar power project

Flashfloods have blocked the Doda-Kishtwar highway and buried vehicles at the under-construction Kwar power project. Authorities are conducting road clearance and restoration work, advising commuters to avoid the highway until it reopens.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting