Skip to content
The Nexus
TECHNOLOGYJul 6 · 13:30 UTCTHE RIO TIMESSofia Gabriela Martinez

Bogotá’s First Metro Train Is Finally Rolling

Bogotá’s first metro train is running test laps on an elevated viaduct after decades of delays. Line 1 is 77% built, with nine of thirty trains delivered from China, and the route will span approximately twenty-four kilometers.

Nexus surfaces and summarizes. The full story lives at the source.

Mentioned
Spot something wrong with this article?Report a problem →
Forward this
Related Signal

Adjacent reporting